Cooling System, Minus Tower For Advantage 85 Ton System * Pump deck * Process Pump is 15hp * Pump to tower is 7.5hp. * 500 Gallon Plastic Resivoir * Control Panel In good working condition, removed from service. All that is needed is the 85 Ton Tower!
